Click image to enlarge

Click image to enlarge.

Competition aim

The aim of the competition is shown on the left.

Click here to read about the idea and concept of the WorldSkills Competition and the WorldSkills organisation.

Stay tuned to www.worldskillsmechatronics.com. This website will continuously be updated up to and including the next competition. It will also include all National competition information. It is your 'one-stop' site for WorldSkills Mechatronics.

top of page

Trade description

Click here for the Trade description for St Gallen - Trade 4 Mechatronics. (pdf file - 13KB/3 pages)

top of page

Sections of competition in Seoul - click to enlarge. Seoul 2001 - structure of competition

The competition lasts 4 days, and must cover between 18 and 22 hours work. The Mechatronics competition in Seoul was split in to 11 sections (see slide on left - click to enlarge). According to the Trade Description, points must be awarded as follows:

  • Design 5
  • Assembly 10
  • Commissioning 20
  • Programming 35
  • Troubleshooting 30

These points are distributed among the 11 sections.

Competition action from Seoul. These vary in length from 30 minutes to 4 hours. Section 1 was the assembly of a known station - one that the competitors were familiar with. This was followed by troubleshooting on that station. In all subsequent sections, competitors either had to develop their own solutions to a problem by ordering parts from a competition catalogue (this was done in 2 sections) or build and integrate new stations of a given design. This experiment was part of the move towards adding Productivity to the criteria Time and Performance and is now anchored in the Trade Description, the document that outlines the scope of the next competition. The final, unofficial Section 12 was "Drinking Beer and "Singing in 3-part Canon". It was not evaluated. The unofficial section always seems to be the most fun for everyone...
The final installation - click to enlarge. After 4 stressful days the competitors had all built an assembly line that manufactures a number of variants of products that have 3 different coloured housings and 3 instruments - clock, hydrometer and thermometer. The slides at the front of the robot station contain the instruments, the slides on the right are for the finished product by instrument type. The products were designed to be highly attractive as giveaways. They were!

top of page

  St Gallen 2003 - structure of competition

Download this PowerPoint presentation.

top of page