tasks_for_seoul_580.jpg (49608 bytes)

This extract from the initial Excel spreadsheet shows the design of the competition. The columns show the number of hours per section, the abbreviations for the stations used in the section (key at the bottom), the name of the sections and the number of points allocated to them.

Back

The final assembly - all competitors had built an assembly line that manufactures a number of variants of products that have 3 different coloured housings and 3 instruments - clock, hydrometer and thermometer. The slides at the front of the robot station contain the instruments, the slides on the right are for the finished product by instrument type.

The final assembly.

Back